Monday 22 February 2016

Progress at last

Work on the bathroom finally restarted last week so I've had very basic facilities while the fitters were at work.



Progress is slow but steady with most of the time being taken up with replumbing and tiling.


I got a little sneak preview on Friday as everything went in to check the measurements. I was always going to be a tight fit for the sink so it needed checking in time to order a different style if necessary. Thankfully it fits but then it had to come back out so the floor could be tiled.

The weekend gave me time to paint the ceiling before the bath goes in as well which made it much easier.

No comments:

Post a Comment